Description

The execution of 13 Main roads in new Mansoura city with widths ranging from 25 m to 60 m and a total length of 17 km

The execution of 53 secondary roads with widths ranging from 15 m to 25 m and a total length of 21 km.

Field: Infrastructure- Roads
Location: New Mansoura City 
Client: New Urban Communities Authority (NUCA)
Consultant: ECG-ENGINEERING CONSULTANT GROUP
Project duration: 2018 – 2019