AMIREYA FACILITIES
Transporting sewage from El-Amireya pump station which is from the largest pumping stations in Egypt, to El-Khosoos through three reinforced concrete pipelines using Micro-Tunneling technologies.
Client
Construction Authority for Potable Water & wastewater (CAPW)
Duration
2014- 2018
Contract Value
52,000,000 USD
Type
AMIREYA FACILITIES
Transporting sewage from El-Amireya pump station which is from the largest pumping stations in Egypt, to El-Khosoos through three reinforced concrete pipelines using Micro-Tunneling
technologies.
Scope of work:
• Supply, installation, and testing for 3 sewage pipelines with an internal diameter 2.7m and an external diameter 3.2m using Micro-Tunneling technologies with total length of 10km to transfer sewage from Amireya station to Al Khosoos.